HAAS ST 30Y NO FURTHER A MYSTERY

Haas ST 30Y No Further a Mystery

Haas ST 30Y No Further a Mystery

Blog Article

These are our initially CNC equipment, and we have been very happy With all the equipment and also the assistance. The ST-30 does a lot of our areas, since we make countless pulleys and round parts.”

*Observe: Due to continual structure improvements, 3D versions and format drawings may not be accurate to the latest creation product.

Utilize a hoist and eye bolts [3] To place the turret in the correct position. Align the turret with the dowel pin. Make certain the turret is inside the pocket-1 placement.

If you need to make House as part of your workshop, or are upgrading your recent plasma cutter, you should get in contact. Get the most beneficial current market price for almost any utilised CNC or handheld plasma cutter. Providing you with negotiating electrical power with your upcoming device.

Make sure you enter your information and facts below to receive your quick quotation. To skip this stage Later on, basically enter a password underneath to build your free MyHaas account. Have already got an account? Sign In

You will need to have access to the Command cabinet for protection and typical functions. Make sure you this site have an area of three' (one m) in between the Management cabinet and any buildings.

If the HPU solenoid receives voltage, but will not operate correctly, cleanse the solenoid or speedy valve:

PRICE LOCK Get in touch with us now and your price are going to be locked in without any long run raises. It is so simple as that.

Interest! Optional large-functionality spindles have a greater electrical power requirement than the standard spindle. Validate the facility need just before working electrical power for your device.

If this alarm happen throughout the zero return method,  increase the tailstock strain and zero return the tailstock.  

Just include a suggested tooling package on your device quotation or search our big choice of Haas Tooling merchandise under:

If you intend To place the device with a floor aside from the bottom stage, seek the advice of by using a structural qualified.

A individual floor wire needs to be linked to the chassis of the machine. The ground wire has to be provided back again on the company panel that is powering the machine.

The excavation must be cut in the vicinity of flat floor. Clear away any free content inside the excavation. This prevents settling.

Report this page